TECHNICAL

Save Time and Money

The installation time is greatly reduced. No preparation work is needed such as a stucco scratch coat. No mixing of mortar. No time wasted waiting for dry and warm weather. Simply install the starter “J” channel and start screwing tiles to the wall.

DETAIL DRAWINGS

STONETILE ABOVE BRICK WATER TABLE

View

STONETILE OVER WINDOW / DOOR SECTION DETAIL

View

STONETILE COLUMN DETAIL

View

STONETILE BAY WINDOW DETAIL

View

SPECS & LIMITATIONS

Technical Guide
View
Hardy BBT Limited Evaluation Report
VIew
Galvanized Specification
View
AGRA Testing & Evaluation Report
View
TREMCO Dynomic Sealant Testing on Stonetile
View
Intertec 2014 Engineer Report
View
Phone

(403) 279-2214

Location

4055 – 96 Ave SE, Calgary AB T2C 4T7

Email

foralifetime@stonetile.com